Plaza Live Construction Photographs
20150403_01.JPG

04/03/2015 #01 - The first five feet of the wall in the Rehearsal Hall is complete, the plumbing for the two rest rooms has been installed, and now the crew is leveling the dirt base to within a fraction of an inch so the concrete floor can be poured. The floor must be four inches thick and of course must be perfectly level; therefore the dirt base of the floor must be perfectly level.